Monday 19 May 2014

Physics Project Reflection #2




Physics Project Reflection 2


Our project has gone quite well so far, we have finished adjusting the first loop and we have more than enough materials to finish the whole project. It was really frustrating to adjust the loop and it took us an entire hour of work time to get it to work perfectly. The problem was that the tubing made a dent when it was placed on top of the PVC pipe and it made the marble go flying when it passed the dent, so to fix that we covered the hole with a piece of cardboard and now it seems to work fine. We plan to finish the next stage of the roller coaster by the end of next class, which is to make the coaster go round and inside, then out of the triangular building ( building on the left side of the photo ).